Beams and Columns: Part II

Here’s a look at the basement and first floor steel frame mostly completed. With the summer heat upon us, it’s hot work down here as the guys finish bolting and welding connections to allow the second floor steel frame to be constructed. As soon as the next level goes up and the floors are poured, the framing, HVAC, electrical, and plumbing components can begin in the basement. And that’s when things really heat up.