Beams and Columns: Part II
/Here’s a look at the basement and ground floor steel frame mostly completed. With the summer heat upon us, it’s hot work down here as the guys finish bolting and welding connections to allow the next level of the steel frame to be constructed. Corrugated steel floor decking will be in place soon, so that framing, HVAC, electrical, and plumbing components can begin in parallel. And that‘s when things really heat up.
Read More